PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Job site Facing West (800x600).jpg Laying (800x600).jpg Started stripping the shear wall panels at Elev. 7-Stair -4,5 Facing East (800x600).jpg Steel Columns at Derrick -3 Facing South-West(800x600).jpg Steel columns under Derrick -2 Facing West(800x600).jpg Steel Truck Load Facing East (800x600).jpg Bolting Derrick -2 Facing South East (800x600).jpg Building rebar mats for Elev. 7-Stair -4,5 Facing South-East (800x600).jpg Compacting and backfill along foundation walls at column A (1.6-4) Facing West (800x600).jpg
Previous pageNext page Steel columns under Derrick -2 Facing West(800x600)
Steel columns under Derrick -2 Facing West(800x600)